Here are the two drafts I put together before putting up the temple. I'm fairly confident there is a mistake in one of them, but I can't remember where exactly. Basically, something looked okay on paper, but wasn't possible in 3D.
You may notice a few numbers in the corners. Those numbers were from me trying to figure out how many stone pieces I needed for a few of the sections.
For projects that require lots of numerical caculations (column spacing, layers, etc.) drafting the project first is much better than just winging it. Not only do I finish the project quicker, the building looks better in the end because I don't compromise my design when something doesn't quite fit.
Showing posts with label draft. Show all posts
Showing posts with label draft. Show all posts
Sunday, January 23, 2011
Tuesday, March 16, 2010
Crevice: Draft
Here is the paper draft of the floors for Crevice.

I kept the floors fairly true to the original plan. The most notable difference is that I added about 1/3rd more area to the Y-axis.
I kept the floors fairly true to the original plan. The most notable difference is that I added about 1/3rd more area to the Y-axis.